Close Menu
    What's Hot

    Digi Power X Signs AI Colocation Agreement with Leading AI Compute Company for 40 MW Data Center in Columbiana, Alabama

    May 5, 2026

    ZOQQ Approaches Breakeven on a Bootstrapped Path – Bucking the Burn-First Fintech Playbook

    May 4, 2026

    Hantavirus probe deepens after deaths on Atlantic cruise

    May 4, 2026
    Hebrew StandardHebrew Standard
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Hebrew StandardHebrew Standard
    Home » Digi Power X Signs AI Colocation Agreement with Leading AI Compute Company for 40 MW Data Center in Columbiana, Alabama
    ACCESS Newswire

    Digi Power X Signs AI Colocation Agreement with Leading AI Compute Company for 40 MW Data Center in Columbiana, Alabama

    May 5, 2026
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email

    MIAMI, FL / ACCESS Newswire / May 5, 2026 / Digi Power X Inc. (Nasdaq:DGXX)(Cboe Canada:DGX) (the “Company” or “Digi Power X”), an AI data center infrastructure operator, today announced the execution of a Master Services Agreement (the “Agreement”) with Cerebras Systems (the “Customer”) for the colocation of a purpose-built, 40 megawatt (“MW”) AI data center campus located in Columbiana, Alabama (the “Facility”).

    The initial 10-year term is valued at approximately $1.1 billion, with total potential contract value of up to $2.5 billion inclusive of renewal terms – underpinned by a structure that provides Digi Power X with long-term revenue visibility, and Cerebras with guaranteed data center capacity, from the first day of service.

    Digi Power X will develop and deliver the Facility in two phases: Phase 1 comprising 15 MW of IT load, followed by Phase 2 delivering an incremental 25 MW for a combined total of 40 MW. The Facility will be purpose-built to Tier III infrastructure standards optimized for the high-density thermal requirements of next-generation AI accelerator hardware.

    This Agreement reflects the deep commitment that both companies are making to the Columbiana campus – a facility designed from the ground up around the power density and reliability demands of frontier AI compute.

    “This agreement is transformational for Digi Power X. Signing a $1.1 billion anchor contract with a premier AI compute company is validation of everything we have built – our team, our sites, our infrastructure capabilities, and our vision for what a next-generation data center operator looks like. We are no longer building toward the top tier of this industry. We are in it.”

    – Michel Amar, Chairman & Chief Executive Officer, Digi Power X Inc.

    Immediate Construction & Accelerated Deployment

    Digi Power X will commence construction immediately on Phase 1, reflecting the Company’s readiness across power, site development and long-lead equipment procurement.

    Initial Deployment 40MW critical IT load
    Construction Start Immediate
    Phase 1 Ready-for-Service Targeted December 15, 2026
    Full Deployment Targeted by end of Q1 2027

    The Columbiana, Alabama campus was selected for its access to robust power infrastructure, a favorable regulatory environment, and proximity to major fiber corridors serving the southeastern United States. Digi Power X owns the underlying real property, providing a balance-sheet-backed development platform that differentiates the Company from lease-dependent competitors.

    The Company has already completed construction of the dedicated on-site substation serving Phase 1, with grid interconnection finalized and a power delivery agreement in place with Alabama Power – minimizing two of the most significant development risk factors typically associated with large-scale data center projects and positioning the Columbiana campus for an accelerated construction timeline.

    Digi Power X plans to commence site development immediately and targets Phase 1 Ready-for-Service in December 2026, with Phase 2 delivery to follow. Phase 1 construction is being self-funded by the Company, reflecting Digi Power X’s financial commitment to the Columbiana campus and its confidence in the long-term value of this partnership.

    “This deal is a statement. Closing a contract of this magnitude with one of the prominent emerging companies of the AI era signals Digi Power X is a serious player operating at the highest level. This is the kind of landmark transaction that we believe will open the door to additional sophisticated tenants, lenders, and partners.”

    – Alec Amar, President, Digi Power X Inc.

    “The buildout of high-density AI infrastructure is one of the defining challenges of our generation, on the scale of the rollout of 4G and 5G that transformed global connectivity. This agreement reflects Digi Power X’s vision, the strength of its team, and its ability to execute as a foundational player. I’m proud to be part of what Digi Power X is building.”

    – Hans Vestberg, Senior Advisor, Digi Power X Inc.; Former Chairman and CEO, Verizon Communications; Member, Board of Directors, BlackRock

    Strategic Significance

    The Agreement is expected to be a core driver of Digi Power X’s forward revenue growth.

    • Revenue commencement: Expected late 2026.
    • Full revenue ramp: Upon completion of full deployment, targeted in Q1 2027.
    • Upside: Customer expansion option for an additional $1.4 billion.

    About Digi Power X

    Digi Power X is an AI infrastructure company, operating a vertically integrated portfolio of power assets and data center capacity across Alabama, New York, and North Carolina, with approximately 400 MW of secured power across its sites. The Company’s NeoCloudz platform delivers GPU-as-a-Service on dedicated, bare metal NVIDIA infrastructure. For more information, visit www.digipowerx.com.

    Investor Relations

    For further information, please contact:
    Michel Amar, Chief Executive Officer
    Digi Power X Inc.
    www.digipowerx.com
    Investor Relations: T: 888-474-9222 | Email: IR@digihostpower.com

    Cautionary Statement

    Trading in the securities of the Company should be considered highly speculative. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Cboe Canada does not accept responsibility for the adequacy or accuracy of this release.

    Forward-Looking Statements

    Except for the statements of historical fact, this news release contains “forward-looking information” and “forward-looking statements” (collectively, “forward-looking information”) that are based on expectations, estimates and projections as at the date of this news release and are covered by safe harbors under Canadian and United States securities laws. Forward-looking information in this news release includes statements regarding the Agreement, including expected TCV from the Agreement during its term, and goals, expectations and targets for the business of Digi Power X. In some cases, you can identify forward-looking statements by terms such as “may,” “will,” “should,” “expects,” “plans,” “anticipates,” “could,” “intends,” “targets,” “goals,’ “projects,” “contemplates,” “believes,” “estimates,” “forecasts,” “predicts,” “potential” or “continue” or the negative of these terms or other similar expressions. The forward-looking information is subject to a variety of known and unknown risks, uncertainties and other important factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements, including, but not limited to: changes to or modification of the Agreement in the future; future capital needs and uncertainty regarding the Company’s ability to raise additional capital; costs associated with the development, manufacturing and deployment of AI infrastructure; construction execution risks and delays in long-lead equipment delivery; global demand for AI computing infrastructure; further improvements to profitability and efficiency may not be realized; and other related risks, some of which are more fully set out in the Company’s annual report on Form 10-K for the year ended December 31, 2025 and other documents disclosed in the Company’s filings at www.sedarplus.ca and in the Company’s annual, quarterly and current reports filed with the SEC on its website, www.SEC.gov/EDGAR. The forward-looking information in this news release reflects the current expectations, assumptions and/or beliefs of the Company based on information currently available to the Company. Although the Company believes that the assumptions inherent in the forward-looking information are reasonable, forward-looking information is not a guarantee of future performance and accordingly undue reliance should not be put on such information due to the inherent uncertainties therein. The Company undertakes no obligation to revise or update any forward-looking information other than as required by applicable law.

    SOURCE: Digi Power X Inc.

    View the original press release on ACCESS Newswire

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    ZOQQ Approaches Breakeven on a Bootstrapped Path – Bucking the Burn-First Fintech Playbook

    May 4, 2026

    HrFlow.ai Secures 7 Million Dollars (Pre-Series A) to Become the Global Standard for Artificial Intelligence (AI) Applied to HR Data

    April 29, 2026

    Datavault AI Further Expands IP Portfolio with New Patent Issuance and Notices of Allowance

    April 22, 2026

    Graid Technology Launches Agentic AI Storage Portfolio to Eliminate KV Cache Bottlenecks

    April 21, 2026

    U.S. Polo Assn. Debuts Global Flagship at a Top Miami Destination

    April 20, 2026

    U.S. Polo Assn. Debuts Global Flagship at a Top Miami Destination

    April 20, 2026
    Latest News

    Hantavirus probe deepens after deaths on Atlantic cruise

    May 4, 2026

    Hantavirus probe deepens after deaths on Atlantic cruise

    May 4, 2026

    GCC beats global average in 2026 economic freedom index

    May 2, 2026

    UAE and France hold talks on regional stability

    May 1, 2026

    CBUAE leaves base rate unchanged at 3.65%

    April 30, 2026

    South Korea retail sales climb 5.6% in March

    April 29, 2026

    UAE and Mauritania presidents deepen bilateral ties

    April 27, 2026

    UAE India dialogue turns to security and energy

    April 27, 2026
    © 2026 Hebrew Standard | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.